The service life of EAF dry ramming mass

 nder normal circumstances, the one-time life of dry ramming material can reach more than 300 furnaces, and it can be extended to 500~600 furnaces through hot repair, and even some products on the market can reach more than 600 furnaces.

After the electric furnace bottom ramming material is used for a certain period of time, due to various reasons, the electric furnace bottom will be damaged in different degrees. Therefore, the furnace lining should be repaired according to the damage of the furnace lining.

(1) Hot repair is carried out every certain period during smelting, but after each furnace steel is finished, attention must be paid to the dynamics of the bottom of the furnace, and the pit must be repaired when the depth is greater than 150mm.

(2) Before repairing, blow off the repaired surface with oxygen (immediately after the steel and slag are released) to completely remove the residual steel residue in this part.

(3) Lift in the ramming material until it falls above the part to be repaired, and move the crane to make the distribution reasonable.

(4) Lift into iron blocks or other heavy objects to compact.

(5) If the furnace bottom and furnace slope are hot repaired in a large area, in order to ensure the service life after repair, shorten the number of repairs, and reduce the consumption of steel per ton of dry ramming mass.

We Changxing Refractory Material Co.,LTD is professional manufacturer and supplier of refractory materials for more than 30 years. Our high quality refractory products are good sold to many countries say South Africa, Bangladesh, Indonesia, Malaysia, etc. Shall any interests, welcome to contact us. Our team would make best to be your reliable partner!

Article Source:The service life of EAF dry ramming mass
Company name: Henan Changxing Refractory Materials Co.,Ltd
More refractory products:https://www.cxrefractories.com/en-product-solution
Email:info@cxrefractories.com
Website:https://www.cxrefractories.com



Construction of EAF Dry Ramming Mass

 

The specific construction steps can refer to the following scheme:

1. After shoveling the material flat with a shovel, step on it firmly with your foot to remove the air, insert the steel drill into the material and shake it repeatedly, and then use your foot to keep it solid. The construction thickness of each layer of the ramming material is 150~ 200mm is appropriate, and then use a knotting tool to ram it 3 times in a spiral shape from the periphery to the center.

2. The method to check the quality of knotting is usually to put a round steel with a diameter of 5mm on the ramming layer and press it down with a pressure of 10kg, and its depth does not exceed 30mm.

3. Steel brazing can be inserted forcefully during site construction, and its depth should not exceed 30mm. The method of knotting the furnace slope is the same as that of the furnace bottom. First, use your feet firmly, and then use the knotting device to ramming. The maximum angle between the furnace slope and the furnace bottom does not exceed 40°. Prevent rolling or collapse due to the furnace slope is too large.

4. In places where steel tapping bricks, furnace doors and other places where molten steel is agitated and scoured severely, it should be rammed strongly and can be appropriately thickened to extend the service life of the refractory materials in these damaged parts as much as possible.

5. After the ramming is finished, cover the ramming material with 5~10mm thick thin steel plate to prevent the shape of the furnace bottom from being damaged or the waste steel penetrates the ramming material layer when loading the scrap steel, which may cause the hidden danger of steel leakage. If steel cannot be made in time, 100~200mm thick lime should be placed on the iron plate to prevent hydration of the ramming material.

When knotting the ramming material, it must be operated strictly in accordance with the construction requirements to ensure the compactness of the ramming material, otherwise it will cause the ramming material to shrink seriously during use, causing a large number of cracks and spalling, resulting in a decrease in life.

The first furnace is very important for smelting, and the oxygen blowing pipe must not be inserted too deep during oxygen blowing and decarburization, otherwise it is easy to cause the ramming material at the bottom of the furnace to turn up and produce big pits. During the smelting of the first furnace, the bottom of the furnace can be covered with a layer of lime, which not only prevents the scrap steel from directly hitting the bottom of the furnace, but also prevents the ramming material from hydrating, and can form slag earlier.

Article Source:Construction of EAF Dry Ramming Mass
Company name: Henan Changxing Refractory Materials Co.,Ltd
More refractory products:https://www.cxrefractories.com/en-product-solution
Email:info@cxrefractories.com
Website:https://www.cxrefractories.com